2 Estimates

Estimates

The PM is responsible for the number of hours estimated for this HUB feature. The technical and functional resources will tell the PM their individual estimates and the PM will enter that combined number here.

This estimate includes:

  • The time required to detail the requirements and functional design in this document
  • The time required to hand over and discuss the requirements to the developer
  • The time required to detail the technical design in this document
  • The time required by the HOIST developer to develop the solution and delivery artifacts
  • The time required by the HOIST developer to perform technical testing
  • The time required by the HOIST business analyst to perform functional testing
  • The time required by the HOIST business analyst to perform testing with the client

T-Shirt Estimate

This section is used to specify a rough estimate for the development of the features specified in this HUB Spec. This estimate is given before any detailed business requirements have been captured and will be based on the QTY per type of HUB feature (New Module, Page, Field, Feature), but will not reflect details regarding how difficult or simple the implementation will be.

Size HUB Type (Example) Hours
XS Extra Small 4
S Small 8
M Medium 16
L Large 40
XL Extra Large 80
EPIC EPIC 100+

HUB T-Shirt Estimates

HUB # Description Size Total Hours
1 Sales Quotation Epic 24

Detailed Estimate

HUB Obj # Description Estimator(s) Estimate Type Estimated Hours
Detail Requirements Func.
Func. / Tech. Collab. Func. / Tech.
Detail Requirements Tech.
Development Tech.
Testing Tech.
Testing Func.
Delivery Tech.
Testing Func.
Client Testing Func.
TOTAL: