Files
wiki-hoist/docs/hub-documentation/delivery/test-plan.md
T

45 lines
2.5 KiB
Markdown

---
sidebar_position: 1
title: Test Plan
---
# Test Plan
## Technical & Unit Testing
Developers are required to thoroughly test HUB functionality by evaluating parameters such as null values, edge cases, and all potentially valid inputs against the technical specifications and requirements. Testing must confirm that no error messages are generated. Additionally, developers should perform regression testing between version changes to ensure that all existing HUB functionality remains correct and unaffected.
| Business Req # | HUB Obj # | Step # | Step Description | Test Data Input | Expected Result | Actual Result | Tester | Date Tested | Environment Tested |
|----------------|-----------|--------|-----------------|-----------------|-----------------|---------------|--------|-------------|-------------------|
| | | | | | | | | | |
---
## Business Test Plan
This section details the testing procedures to verify that the HUB spec fulfills the business requirements outlined in the specification. Test plans must directly align with these requirements to confirm their successful implementation.
Testing instructions should be:
- Clear and step-by-step
- Accessible to individuals unfamiliar with the solution
- Include specific basic data (sample inputs or datasets) for reliable and repeatable outcomes
Collaboration between the HOIST Business Analyst and the customer is essential to develop accurate and mutually agreed-upon test plans.
| Business Req # | Test # | Step # | Step Description | Test Data Input | Expected Result | Actual Result | Tester | Date Tested | Environment Tested |
|----------------|--------|--------|-----------------|-----------------|-----------------|---------------|--------|-------------|-------------------|
| | | | | | | | | | |
---
## Client / User Testing
This section is designed for use by the customer during the customer testing phase. The table in this section must align with the table in the Functional Results section above.
Successful testing of the HUB feature confirms that it has been developed and delivered as specified. Any changes or additional requirements should be documented in the Change Log section.
| Business Req # | Test # | Step # | Step Description | Test Data Input | Expected Result | Actual Result | Tester | Date Tested | Environment Tested |
|----------------|--------|--------|-----------------|-----------------|-----------------|---------------|--------|-------------|-------------------|
| | | | | | | | | | |